Questionnaire - Conversion Energy Systems
CONVERSION ENERGY QUESTIONNAIRE
Technical Considerations
Commercial
Considerations
Other
Factors

    • 1

      Step 1

    • 2

      Step 2

    • 3

      Step 3

    • 4

      Step 4

    • 5

      Step 5

    • 6

      Step 6

    • 7

      Step 7

    • 8

      Step 8

    • 9

      Step 9

    • 10

      Step 10

    • 11

      Step 11

    • 12

      Step 12

    • 13

      Step 13

    • 14

      Step 14

    • 15

      Step 15

    • 16

      Step 16

    • 17

      Step 17

    • 18

      Step 18

    1/18

    Step 1

    Describe your business below:

    What types of material do you process?

    SELECT ALL THAT APPLY:








    What types of material are in your waste stream?















    What type of contaminants are present in your waste material?

    TYPES OF WASTE AND RATIO:











    Describe the condition of your waste


    (I.E. size and moisture level)

    What do you do with your waste stream ?

    SELECT ALL THAT APPLY:







    What much waste do you generate?

    TONS/DAY:

    What energy does your facility use?

    CLICK ON THE BOX IF YES:





    What is your average cost of electricity?

    CENTS $ PER KW/H, PLEASE INCLUDE TAXES:

    Do you have an additional time of use costs for electricity?

    I.E. DURING MID-DAY VERSUS NIGHT


    Do you have an additional demand costs for electricity?

    I.E. PEAK USAGE CHARGES ADDED


    if you are using heat, what are your costs per month for:





    What are your tipping fees?



    What are the freight costs associated with the disposal of your waste?



    Is your facility at its power limit capacity?

    Have you been made aware of local application credits or invested incentives for environment or energy?


    Please specify state(s) and location(s) in which your facility(ies) is(are) located:

    What is your typical timeframe for decision making on Capital Equipment with ROT payback of 5 years or less?


    Are you the decision maker?